The Stride Treglown Industrial design team faced a number of site and operational constraints when designing the new Automated Processing Centre for the Royal Mail.
The 20,000 sqm development has two distinct areas; a sorting hall and administration accommodation. In our design, we took account of specific user activities and needs, creating functional spaces that provide maximum natural light and protection from solar glare.